Pre-Project Kickoff

Effluent-Outfall-1SIZED_600450

Pre-Construction and Pre-Project Kickoff

  • Plan Expediting
  • Constructability Design Review
  • Documents Quality Control and/or Quality Assurance (QA/QC)
  • Environmental Policy and Regulations (local, state and federal)
  • Drainage Solutions (based on Impervious Surface and Required Detention Time)
  • Site Evaluation (Historical / Existing) Conditions